Skip to content
SHYNE

Tech & energy news for Nevada and Arizona

  • About
  • Editorial
  • President Obama
  • Expertise & Projects
  • Contact
  • About
  • Editorial
  • President Obama
  • Expertise & Projects
  • Contact

Author: admin

Green hydrogen in Nevada and Arizona: what’s real, what was cancelled and what comes next

Rows of electrolyzer containers and hydrogen storage tanks beside a large solar farm in the Arizona desert at golden hour

Fortescue’s $550M Buckeye plant was cancelled and the Arizona-Nevada hub bid lost. What green hydrogen actually runs in Nevada and Arizona, and what the 2028 tax-credit deadline means.

Thacker Pass lithium mine: what’s being built in Nevada, and what it means for Arizona

Lithium mine and processing plant under construction in the northern Nevada high desert at golden hour

About 2,000 workers are building Thacker Pass, North America’s largest known lithium resource, in northern Nevada. What’s confirmed, what’s a target, and why Arizona is watching.

Redwood Materials in Nevada: from battery recycling to powering AI data centers

Rows of repurposed electric vehicle battery packs beside a solar array and modular data center in the Northern Nevada high desert at blue hour

Redwood Materials recycles batteries near Reno and now uses old EV packs to power AI data centers. What’s confirmed, what’s claimed, and what it means for Nevada and Arizona.

AI data centers in Nevada and Arizona: the power, water and gas-plant fight explained

A large data center campus with transmission lines in the Northern Nevada high desert at blue hour

Nevada approved two private gas plants for data centers and is weighing a third tied to Switch, while Arizona utilities run short on reserves. What’s confirmed, and what it means for power, water and bills.

Tesla Semi volume production in Nevada: what the new truck factory means for the Southwest

Electric semi-trucks charging at a megawatt charging depot in the Nevada high desert at blue hour

Tesla is now building its Class 8 electric Semi at scale next to Gigafactory Nevada, on 4680 cells. What’s confirmed, what’s still a company claim, and what it means for Nevada and Arizona.

TSMC Arizona explained: inside the Phoenix chip cluster

Semiconductor fab campus in the north Phoenix desert at blue hour with construction cranes and mountains behind

TSMC moved its second Arizona fab forward to 3Q 2027 and has $265 billion committed in Phoenix. What is running, what is coming, and the jobs, water and power behind it.

Tesla’s “flying” Roadster: what was really shown, and what’s actually taking off in Nevada and Arizona

A red electric sports car hovering briefly above a desert test track on jets of air at dusk

Tesla’s long-delayed Roadster briefly flew on compressed-air thrusters. What it really did, what’s unproven, and what’s actually taking off in Nevada and Arizona.

SHYNE

Tech & energy news for Nevada and Arizona

All rights reserved